Who should be on board
- 1Your captain or the captain you will hire: they will live with the boat and notice what others miss.
- 2An independent surveyor or engineer working for you, not for the seller or the yard.
- 3For a new build, your owner's representative and the yard's commissioning lead.
What to run and measure
- 1Every engine and generator under real load for long enough to reach stable temperatures, not just a quick run-up.
- 2Fuel consumption at your planned cruising speed and at full speed, recorded against engine hours and fuel flow.
- 3Vibration and noise in cabins and the wheelhouse at several speeds. Write the speeds down when something changes.
- 4Stabilisers, thrusters, steering from hard over to hard over, and the get-home or back-up propulsion if fitted.
- 5Anchoring, tender launch and recovery, watermaker, heating and air-conditioning under load.
“If a problem appears on the sea trial, it is a negotiation point. After you sign, it is your problem.”
Vibration: normal or not?
Some vibration at certain speeds is normal on any motor yacht. What matters is whether it is new, whether it gets worse with speed or time, and where it comes from. Propellers, shafts, couplings, engine mounts and alignment are the usual suspects. Owners in the forums often regret accepting a boat with a vibration 'that will settle down'. Ask for measurements, and agree in writing who fixes what before closing.
When to walk away
- 1The seller or yard will not let you run the boat under full load.
- 2Findings are explained away instead of investigated.
- 3Logs, maintenance records or class documents do not match what you see.
- 4Repairs needed are a large share of the price, and there is no clear agreement on who pays.