“Semi-custom”
Anything from new fabrics to a new hull. Ask which drawings are frozen and which can still change without new engineering.
Not the textbook definitions. The phrases you’ll hear across the table, and what to ask next.
Anything from new fabrics to a new hull. Ask which drawings are frozen and which can still change without new engineering.
A date in the yard’s plan, not steel being cut. Ask whether the hull is in fabrication and who has the slot before you.
The yard started without a buyer. Faster delivery and often a good price, but less say over layout and systems.
Teething problems are likely. Ask for a better price, a longer warranty or both.
A marketing phrase. Check tender capacity, storage, redundancy, endurance and real ice notation.
There is no rule behind it. An ice class from a classification society is what counts, and insurers know the difference.
Usually at the slowest speed, with no reserve. Ask for range at your cruising speed with a 10 % reserve.
Designed to stay below the line where crew and certification rules tighten. Smart, but check what was given up to stay there.
An independent society checked the build. Ask whether she stays in class after delivery and what the next survey costs.
Look at the clause behind it: what the yard pays per week of delay, and from when.
Everything not in the contract, from linen to tenders. Budget 2–5 % on top, and agree who installs it.
Every change after signing costs money and time. Ask for a price and a delivery impact in writing each time.
Your own engineer at the yard during the build. On a first project, you almost always do.
A second boat carrying tenders, a helicopter or a submarine. Sometimes the smarter answer than a bigger explorer.
Send it to me. I reply within 1 hour.